 |
|
Call Us Now: 973-955-2020
|
|

|
|
|
|
 |
|
|
|
|
|
 |
First is the examination: We do not begin installation
until substrates have been properly prepared. If the
substrate preparation is the responsibility of another
installer, notify Architect of unsatisfactory preparation
before proceeding.
1 . At the time of preparation to start working: We make sure
that the surface where the work is taking place is clean
thoroughly. We prepare the surfaces using the methods
recommended by the manufacturer for achieving the best for
the substrate under the project conditions.
2. Start installation: we install under the indicated
instructions and drawings. Then, we clean glass and metal
surfaces.
3. Explaining the protection: we tell you how to protect the
product until the project is complete. Then, there's
touch-up, repair and or replace of damaged products before
the substantial completion of the project.
|
|
| |
|
Contact
Stainless Architectural Metalworks Inc.
|
| Tel: |
973-955-2020
|
| Fax: |
973-955-2022
|
|
|
|